Energy meters installation at Hugo de Groot School
On Monday 27th March a visit to Hugo de Groot was conducted to install PowerPoint energy meters together with the local electrical contractor. The 1st part of the installation was successful and followed to a great extent the initially planned installation strategy: main energy incomer of the main (old building), 2nd floor main energy incomer, 2nd floor corridor, and 9 classrooms light and sockets. The 2nd part will be soon arranged to monitor the incoming data and the signal of the transmitter with the possibility to install an extension antenna.
Activity date: 27-03-2020; Updated: 09-06-2020